Public bridleway and footpath closed
Temporary closure
Public bridleway and footpath no. 270 (Bramley)
Road Traffic Regulation Act 1984, Section 14(2)
The ßÙßÇÂþ» hereby gives notice that from 09.00am on 27 November 2025, no traffic shall proceed along the length of public bridleway and footpath no. 270 (Bramley), as shown by the solid black line between points A and B (bridleway) and A and C (footpath) on the attached plan.
The closure is required on the grounds of public safety due to construction works and will be in operation for a period of 21 days. The closure will then be extended for up to 6 months by a temporary closure order.
The temporary closure will only be in operation when appropriate road traffic signs are displayed on site by the County Council or an authorised person acting on its behalf. Access to properties will not be affected.
Alternative route: from point A proceed northeast through the field to point B, as shown by the dashed black line on the attached plan.
Dated: 27 November 2025
Lucy Monie, Director - Highways, Transport and Network Management
Any Enquiries relating to this notice should be directed to: Countryside Access Team, ßÙßÇÂþ», Whitebeam Lodge, Merrow Depot, Merrow Lane, Guildford, GU4 7BQ. Tel: 03456 009009 or email: rightsofway@surreycc.gov.uk
Files available to download
-
Bridleway and footpath 270 (Bramley) temporary closure plan (PDF)
Plan showing the temporary closure of public bridleway and footpath number 270 (Bramley) for public safety, and alternative route.